Friday, February 24, 2017

Barn walkway done

 Over the last couple of days, I put another 1000 lbs or so on the barn walkway. It seems to be at grade now, a nice level walk over to the walk gate.
 There was a lot of "hole" to fill in, and I cut all the wild roses away from the fence here.
There is still a bit of pipe on the other side of the fence that Heather and I will need to get covered, but that will require dirt or compost materials.

Monday, February 6, 2017

Walkway almost done

 The crossing is starting to look good. There is still a small dip to the left of the shadow that will need a bit more.
 It took about two more tons of dust with a few slightly larger chunks mixed in  to get it this close.
 Considering I started with about an 18" washout, it is looking pretty good.
Heidi and Tessa were watching me the whole time. I think they wanted to help.