Allen got the boxes tacked into place and the wires strung around the room.
There are 2 on each of the shorter walls and 4 on the long wall.
It took us a day and a half to get the insulation put in. This is Allen stapling in the LAST piece in the wall before we started the ceiling. It was in the 90's for this job and miserably hot working. We consumed a lot of fluids.
The pieces in the ceiling are 4 ft. batts. Jessica helped hold them in place while I fastened them to the joists.
The floor still has to be done, but the walls and ceiling are complete. We're trying to get someone to come do the drywall next. I'm not very good at doing that.