Sunday, May 26, 2024
Barn is torn down
This is all that is left of the barn. I'll be burning these remaining scraps in the next couple of days and hauling the metal roofing to the recycling place in Camargo. Progress on the new place is slow, but ongoing.
Saturday, May 18, 2024
garden all planted
I finished up with the planting of the garden this morning when I put in another row of beans. I will can them and be able to store them for several years, if needed. There is also Oxheart and Roma tomatoes and black-eyed peas planted as well.
The early plantings are doing well. We have started eating the spinach and lettuce already and the onions are looking good.
The early plantings are doing well. We have started eating the spinach and lettuce already and the onions are looking good.
Monday, May 6, 2024
Tank is in
The guys were back this morning, dug the hole and the new tank was delivered and hooked up. The inspection is still due. We need a few loads of dirt to smooth it out. That is coming from his next job and will be here in the next few days.
While they were waiting for the tank to be delivered, the leaking hydrant was dug up and replaced. (thanks, Lisa and Jim!)
While they were waiting for the tank to be delivered, the leaking hydrant was dug up and replaced. (thanks, Lisa and Jim!)
Friday, May 3, 2024
Residence for the girls
The construction for the girls place has finally started. The drain field is put in now. I had pulled part of the front fence down yesterday so the equipment could be brought in.
The tank is supposed to be put in on Monday. They stopped for today because it started raining again, but they had already finished up the leach field.
The tank is supposed to be put in on Monday. They stopped for today because it started raining again, but they had already finished up the leach field.
Subscribe to:
Posts (Atom)