Tuesday, July 6, 2021

Drywall is finished

The drywall is now finished. He used a lot more mud than I thought he would. Maybe that is why my attempts look so poor compared to this.
I still have to get the 4th wall done, but that is going to be wood, not drywall.
The room is getting closer to being done.
 

Sunday, July 4, 2021

Drywall is hung

The drywall is now hung in the new room. It really brightened it up a lot.
The guys will be back tomorrow to do the tape and mud. It's really shaping up now.
 

Thursday, July 1, 2021

Room progressing

Allen got the boxes tacked into place and the wires strung around the room.
There are 2 on each of the shorter walls and 4 on the long wall.
It took us a day and a half to get the insulation put in. This is Allen stapling in the LAST piece in the wall before we started the ceiling. It was in the 90's for this job and miserably hot working. We consumed a lot of fluids.
The pieces in the ceiling are 4 ft. batts. Jessica helped hold them in place while I fastened them to the joists.
The floor still has to be done, but the walls and ceiling are complete. We're trying to get someone to come do the drywall next. I'm not very good at doing that.
 

Saturday, June 5, 2021

New room started

The materials for the new room were delivered on May 19 and they started work a couple days later.
The concrete supports were dug and framed in the following Monday. They were left for a couple days to cure before any more was done.
The crew got the entire shell assembled in just one day.
Then they put the roofing on. We chose white metal for the longer lifespan of the material.
I liked this shade, so we used it for the siding. We have a watertight shell up now. The HVAC guys were here on Friday and installed a vent in the new room for the heat and A/C. I'm still working on getting an electrician out to run all the new outlets. If I can't get one soon enough, Allen will wire it for me. Then we can insulate and put in the drywall.
This morning, I broke in the new fire ring. I got all the storm damage pulled down and burned. It took most of the morning. There was a lot of it.
 

Wednesday, May 26, 2021

New front brakes for Heather's car

This was from last Saturday morning. I put new pads and rotors on Heather's Camry. It only took a little over an hour.
As you can see, the rotors needed replacing. They were getting really thin. With the mileage on the car when she bought it, and the fact we have not replaced them, my guess is that were original parts from 1998.

 The pads were also down to the last millimeter. She said they made a scraping squawk last week, so we checked them out. Just in time, it looks like.

Thursday, March 4, 2021

New work truck


 My new work truck was brought into the lot in Clays Ferry today. It is still waiting on decals, plates, a tool box and that kind of stuff. It's an 18 speed.


Saturday, January 23, 2021

Gravel pile all spread

I called the quarry in Frenchburg on Monday and got a load of rock delivered for the driveway. It was a good sized load - just over 26 tons.
I borrowed Harry's tractor to fill in the area right next to the shed. Jessica will be parking there now. I intend to move the camper out onto the driveway and needed more driveway for that.
The tractor is a smaller one, but has a bucket and did the job very well.
I filled in across the back wall during the week with a shovel and 5 gallon pails. I was working very close to the wall and the boat and didn't want any damage. Heather helped me clear out the rest of the carport this morning.
It didn't take very long to get it filled in and smoothed out. We won't be sinking in the mud now.
We also put out the frame Allen built for the horses' water trough when he was here. We filled it with gravel and Heather put stall mats over it to help protect their feet. The last remaining part of the pile was spread across the driveway. I tried to fill in some low spots and got it all smoothed out. I think it looks good.