Thursday, July 6, 2017

Back from New Hampshire

I got back from my trip to Allen's in New Hampshire Wednesday night. This was our progress at the end of our work session Wednesday. The sub-floor is assembled, the front and back walls are assembled, and the long walls are each 16 ft long, but need another 8 ft. added to be complete. We couldn't attach anything to the frame because they still haven't issued him a building permit, so we were " pre-assembling" everything we could. Allen has a lot more detail and more pictures on his blog.

No comments:

Post a Comment