Thursday, January 26, 2017

Working on projects

 I started filling in some muddy spots and leveled up the steps for the shed. Some of the extra made a slightly higher walkway. All the gravel I put down last year had sunk into the mud.
 I dug out the bottom of the drainage and put the pipe in. This is where Heather crosses when she goes to the barn.
 It is sealed and I'm trying to bring it up to grade. I've put almost a thousand pounds of rock dust around the pipe so far. It still needs a bunch more, but the crossing is WAY better than it was before.

Heidi wanted to help. So did Tessa, but she was behind the brush on the other side.

No comments:

Post a Comment