Friday, February 24, 2017

Barn walkway done

 Over the last couple of days, I put another 1000 lbs or so on the barn walkway. It seems to be at grade now, a nice level walk over to the walk gate.
 There was a lot of "hole" to fill in, and I cut all the wild roses away from the fence here.
There is still a bit of pipe on the other side of the fence that Heather and I will need to get covered, but that will require dirt or compost materials.

1 comment: