I went over to Cathryn & Bryan's this morning to finish clearing the drainage pipe opening. It doesn't look like much of a hole from the road.
I uncovered the opening last week, but there was a lot of rock debris in the mouth of the pipe and I couldn't get it out with the shovel alone.
Today, I also took the pick with me to help convince the rocks to break up and move. While they didn't break, it got them to shift and move so I could get to the edges and leverage them out.
The hole is deeper than it looked like it was, about 5 ft. to the bottom of the pipe. It should drain a lot better now.
Setting up the new bedroom and updates
1 week ago
No comments:
Post a Comment