The materials for the new room were delivered on May 19 and they started work a couple days later.
The concrete supports were dug and framed in the following Monday. They were left for a couple days to cure before any more was done.
The crew got the entire shell assembled in just one day.
Then they put the roofing on. We chose white metal for the longer lifespan of the material.
I liked this shade, so we used it for the siding. We have a watertight shell up now. The HVAC guys were here on Friday and installed a vent in the new room for the heat and A/C. I'm still working on getting an electrician out to run all the new outlets. If I can't get one soon enough, Allen will wire it for me. Then we can insulate and put in the drywall.
This morning, I broke in the new fire ring. I got all the storm damage pulled down and burned. It took most of the morning. There was a lot of it.