Wednesday, November 6, 2024

Siding installed

As posted a few days ago, this is what I started with after the wall section was put in place and had some house wrap covering the openings in the studs.

I got it up to this point yesterday, with only the top piece left to do. That piece required a lot more cutting and fitting.

Before the rain started this morning, I got it all put into place and fastened in. The siding needs washing, but it has been just hanging around here for several years waiting to be useful.

Once that was finished, the rear gutter had to be cleaned out. It had filled up and composted all the way up to the roof and was growing things. I did get started adding shut-off valves to all the sinks and toilets, but only got about half of them done today.

No comments:

Post a Comment